Extreme Slimming Body Hot Sweat Cream Muscle Stimulator Fat Burning Weight Loss
Product Code: AliFatLossCream-WBS
Price:
$16.65
RRP $39.00
57% OFF
Sold Out
Share This Item:




- Amazing Fat Burning Cream: Our hot cream helps achieve a flat belly, sculptural figure free of stretch marks and accumulating grease & it also reduces the appearance of cellulite, penetrates the pores eliminating excess fatty tissue.
- Easy Absorbed Natural Ingredients: Our weight loss cream is made with no chemicals just natural ingredients include antioxidants & Vitamin E A D for sensitive skin. Our formula ensures your body burn fat while limiting cellulite & strengthening skin for a youthful appearance.
- Rich Texture: Ideal for extremely dry, rough, bumpy skin. opens skin pores for improved circulation, targets sweat glands to, increase perspiration, accelerates warm-up and recovery time.
- Accelerate blood circulation, promote the body's metabolic function, enhance muscle and promote good health. Improve cellulite to make skin smooth and delicate.
- Caution: Although rare, burning or irritation may occur. Test a small amount on the skin first. If uncomfortable or causes irritation, please discontinue use. Only apply to intact skin. Wash hands after use. Keep out of reach of children and pets.
Features:
- Powerful cellulite massager for men and women, burn fat mainly for waist, abdomen, legs and other parts.
- Massage gel helps to tighten and lubricate the muscles, promote metabolism, strengthen muscles.
- Rapid and healthy weight loss,anti-cellulite massage oil is safe without any side effects.
- Improving the slack skin, weight loss cream can make your skin tight and tender.
- Fat burner gel is suitable for all types of obesity.
Why choose our Items?
- Helps to firm, condition and lubricate belly skin.
- Promote metabolism, enhance muscle, Reduce excess subcutaneous fat.
- Effectively crushed fat stored in the abdomen, Promote abdominal fat burning.
- Light and easy to absorb the texture, bring out a more healthy face and more compact body lines.
- Create the perfect waistline, to create an S curve, mermaid waist, A4 waist.
Usage:
- 1. After a shower, apply a liberal amount to your desired area.
- 2. Massage gently, allow the skin to absorb it.
- 3. You'll feel the heat after 15 minutes.
- 4. Twice a day, with continuous use for 2 to 3 months for best results.
- Item Type: Slimming Cream
- Apply to: Waist, abdomen, hips, thigh legs and arms
- Net Content: 60 ml
- Shelf life: 3 years
- Package Weight: 80 g
Be The First To Review This Product!
Help other Aurus Australia Pty Ltd users shop smarter by writing reviews for products you have purchased.